Foundationtest trough or test pile
Checkslot (shallow foundation), will be accompanied by the
staffsurvey together, and whether the field investigation
report,if there is abnormal place, nature of the main
observationbearing layer, such as we are in the area of shallow
foundationNo. 2 Hicks. The soil is hard, yellowish brown color,
alsowill be mixed with some differentiation material the other
sideof the 2. The soil is thin, generally is 1~2 meters, so
thesite can be used 12 rib steel insert bearing layer, see after
theremoval of the soil and the depth in the steel stick to
determineits thickness. The pile (pile), which are mainly
basedon the bearing capacity of the pile to calculate the pile
machinetonnage according to check, soil geological report any
abnormal(mainly through the pile pile up to judge), observe
thelast 1 meters used in degree, the pile up phenomenon is
obvious,the current pile machine check. Especially the strict
controlof cast-in-place piles to a filling coefficient of
cementmixing. Mixing piles shall focus on controlling the
watercement ratio, the cement content per metre, and the number
ofre stir
Basicreinforcement acceptance:
Asthe name suggests, the focus of course is to check the
reinforcement,including steel information is not
comprehensive,factory reports, approach reports,
experimentalreports
Thescene also according to the drawings to check the steel
spacing\ location] wire is not consistent with the
specifications\ basic size, protective layer thickness of
welding,check the quality of appearance
Askfor the test report of welded joints. The length of joint,
thelength of anchorage, and the quality of the reinforcement
worksbest at the joints (the main beam and the main beam, the
LiangZhu joint)
Measured.The additional reinforced beam, such as beam hanger
andfloor hanger setting mode is the opposite. The steel bar
atthe lower end of the horizontal section length.
Isthe position firmly secured?
Thestirrup settings are correct. The template support is
solid.^^^^^in their familiar drawings, and acceptance.
Acceptanceof intermediate structures
Generalengineering can mainly concrete quality \ masonry
qualityand detailed components and roofing these three aspects
tosum up
Concreteaspects:
Reinforcedconcrete, quality common fault, prevention measures
Aconcrete, Ma
Phenomenon:the surface of concrete is short of coarse or coarse,
orthere are many small pits, but there is no reinforcement or
gravelexposed.
Reasonanalysis:
1,the template or rough surface cleaning is not clean, sticky
drycement mortar and other debris, Chaimo concrete surface
viscosityloss.
2,steel template release agent brushing uneven, Chaimo
concretesurface bonding template.
3,the template joint assembly is not tight, the grouting leak
whenpouring concrete.
4,concrete vibration is not dense, concrete bubble not
discharged,part of the bubble stays on the surface of the
template.
Preventivemeasures: clean the surface of the template, must
notstick with dry, hard cement, mortar and other debris. Wood
templatebefore pouring concrete, with water fully wet, clean,
withoutleaving water, so that the template gap stitching tight,
suchas gaps, fill strict, prevent leakage. Steel template
coatingagent should be painted evenly, shall not leak brush.
Concretemust be in accordance with operating procedures,
layered,uniform vibration compaction, to prevent leakage, and
everylayer of concrete vibration until the bubble to exclude.
Processingmethod: pits mainly affect the concrete appearance,
forrepairing large area. The pits parts water scrub, fully wet
wetcement smooth.
Two,honeycomb
LocalSusong phenomenon: the concrete, mortar less gravel, the
gapbetween the stones, honeycomb hole formation.
Reasonanalysis:
1,concrete mix ratio is not reasonable, gravel or cement
materialmeasurement error, or water is not allowed, resulting
inless gravel, gravel and more.
2,concrete mixing time is short, no mixing even, concrete and
easyto bad, vibration is not dense.
3,not according to operating procedures pouring concrete,
improperblanking, so that the concentration of gravel,
resultingin concrete segregation.
4,the concrete once too much material, no subsection, layered
perfusion,vibration or false, or material and vibration, with
bad,not allowed to vibration, vibration and blanking.
5,the template hole is not blocked, or the stability of the
templateis inadequate, vibration concrete template
displacement,resulting in serious leakage.
Preventivemeasures: concrete batching, strict control of
mixingratio, regular inspection, ensure accurate material
measurement(electronic automatic measurement). Concrete
mixinguniform, consistent color, the shortest time to comply
withthe provisions of the regulations. The free dumping height
ofconcrete shall not exceed 2m, if it is exceeded, measures
suchas string, chute and other measures shall be taken. The
tampingand tamping of the concrete shall not exceed 1.25 times
thelength of the acting part of the vibrator. When tamping
concretemixture, the moving distance of the inserted vibrator
isnot more than 1.5 times of its action radius; the fine
aggregateconcrete mixture is no more than 1 times of its action
radius.The distance from the vibrator to the template is less
than1/2 of the effective radius of the vibrator. In order to
ensurethe good combination of the upper and lower concrete,
thevibrating bar is inserted into the lower concrete 5cm and
vibratedconcrete, and the vibrating time of each point must
bemastered. The proper vibrating phenomenon is that concrete
isno longer sinking significantly and no more bubbles. When
pouringconcrete, often observe the template, found that the
templatemove around, immediately stop pouring, and in concrete
precoagulation before finishing intact.
Methods:a small cellular concrete governance, first rinse with
water,then with 1: 2 or 1: 2.5 cement mortar repair, if it is
abig honeycomb, the first will loose gravel and prominent
diameterparticles,try to form a bell mouth, mouth large, then
rinseclean and moist, with a high level of fine stone concrete
tamping,strengthen maintenance.
Threeholes
Phenomenon:there is a gap in the concrete structure, there is
noconcrete locally.
Reasonanalysis:
1,in the dense reinforcement or embedded parts, concrete
pouringis not smooth, not full space template.
2,vibration is not sequentially concrete, resulting in leakage
vibration.
3,concrete segregation, or serious running slurry.
4,concrete construction organization is not good, not in
accordancewith the construction sequence and construction
processseriously.
5,concrete lumps and debris mixed with wood or other bulky
materialsinto concrete.
6,not according to the provisions of the material, too many
materialsat one time, the lower part of the vibration due to
vibrationcan not reach the radius, forming a loose state.
Preventivemeasures:
1,in the reinforcement of dense place, can use fine stone
concretepouring, make the concrete full of template gap, and
seriouslyvibration compaction. When mechanical vibration is
difficult,manual tamping can be used.
2.The holes are placed on both sides at the same time. The lower
partis often filled with discontent and vibration is not real.
Themeasures taken in the lateral opening shall be taken. After
thevibration is compacted, the template shall be sealed again,
andthen poured upwards.
3,using the correct vibration method, to prevent leakage
vibration.A. insert vibrator adopts vertical vibrating method,
thatis, vibrating bar and concrete surface vertical or oblique
vibration,that is, vibrating bar and concrete surface to a
certainangle, about 40 degrees to 45 degrees. B.
Thevibrator can be evenly arranged by inserting points, and
canbe moved in a staggered or staggered sequence, so as not
toleak out. Each moving distance is no more than 1.5 times of
theradius of the vibrator. When the vibrator is operating,
insertthe plug slowly.
4,control the blanking. To ensure that concrete does not
producesegregation when pouring, concrete free dumping height
isnot more than 2m, greater than 2m, with chute, string,
cylinderand other materials.
5,to prevent sand, stone mixed with Clay Lumps of ice or other
debris,debris found in concrete, timely clean.
6,strengthen the construction technology management and
qualityinspection work.
Forthe treatment of concrete holes, it is necessary to study
jointlywith the units concerned and formulate a strengthening
scheme,which can be dealt with after approval
Four,exposed tendons
Phenomenon:the rebar in the reinforced concrete structure is
exposedto the concrete surface.
Reasonanalysis:
1,when the concrete is vibrated, the steel pad is moved or the
cushionblock is too little or even leaked, and the steel bar
clingsto the template.
2,reinforced concrete structure cross-section is smaller,
steelbar too close, if in case of large diameter, gravel on
thesteel bar, concrete slurry can not be full of steel
reinforcementaround.
3,due to improper mixing, concrete segregation, or serious
leakageof slurry template.
4,when the concrete vibration, vibrating bar hit the steel bar,
sothat the steel shift.
5,the protective layer of concrete vibrator is not dense, or
woodtemplate wet concrete surface is not enough, too much water
loss,or early form removal, Chaimo concrete missing edge off
angle.
Preventivemeasures:
1、beforepouring concrete, check whether the steel position
andprotective layer thickness is accurate.
2,in order to ensure the thickness of the concrete protective
layer,we should pay attention to fixing the cushion block.
Usuallyaround 1m or so, a cement mortar block is attached to
thesteel bar.
3,when the reinforcement is denser, choose the appropriate
sizeof crushed stones. The maximum particle size shall not
exceed1/4 of the minimum size of the structural cross section,
andshall not exceed 3/4 of the net clearance of the steel bars.
Whenthe structural section is smaller and the reinforcing bar
isclose, the fine stone concrete can be used for pouring.
4,in order to prevent the shift of steel bars, it is strictly
prohibitedto strike the bar with the vibrator.
5,concrete free down height more than 2m, with string cylinder
orchute and so on.
6,the removal time according to the sample test results to
determine,to prevent premature removal.
7,the operation shall not trample steel, such as steel bending,
ortripping, timely straightening, repair, tie, tie.
Managementmethods: the concrete exposed steel bars and rust
residueclean, rinse with water wet, and then 1: 2 or 1: 2.5
cementmortar pressure formation, such as reinforcement of deep,
theweak concrete removed, washed clean and moist, with a high
levelof fine stone concrete compaction, careful maintenance.
Five,missing edges, angle off
Phenomenon:partial drop of concrete, irregular structure,
edgesand corners are defective.
Reasonanalysis:
1,the wooden template in pouring concrete is not wet or wet
enough,after pouring concrete maintenance is not good, the
edgeof concrete water is absorbed by a large number of
templates,resulting in concrete hydration is not good, the
strengthdecreased.
2,construction, premature removal of bearing template.
3,Chaimo impact force or weight, or not to protect the edges,
beknocked off.
4,winter construction, concrete local cold.
Preventivemeasures: the wooden formwork is fully wetted before
pouringconcrete, and the concrete is carefully watered and
protectedafter pouring. When removing the load-bearing
formworkof reinforced concrete structure, the concrete has
enoughstrength, and the surface and edges and corners are not
damaged.
Nottoo hard too Chaimo, pay attention to protect the edges, lifting, nonimpact angular template. To strengthen the protection of finishedproduct, for many people, such as material transport channel at theconcrete corner, after stripping available channel will protect thecorner, so as to avoid collision damage. Concrete pouring in winter,good insulation work, strengthen the temperature measurement, taketimely measures to prevent cold.
Treatmentmethods: missing edge off angle is small, the water rinse can be wirebrushed fully wet, with 1: 2 or 1: 2.5 are filled with cement mortar.Can be false concrete and
outstandingaggregate particles, except for water washed clean and humid, andthen with a higher concrete than the original level of fine stoneconcrete repair, seriously conservation.
Six.Interlayer of construction joint
Phenomenon:the construction of joints at the seams is not good, there are gapsor folders with debris, resulting in structural integrity of thepoor.
Reasonanalysis:
1,before pouring concrete, did not seriously deal with the surface ofthe construction joint, before pouring,
incompletelyenough.
2,when pouring mass concrete structure, often layered, subconstruction. During the construction period, there are often piecesof wood, sawdust and other debris accumulated in the
concretesurface, not seriously checked and cleaned, again
pouringconcrete mixed with concrete, in the construction
jointscause debris interlayer
Preventivemeasures:
1,in the construction joints continue to pour concrete, such
asintermittent time exceeds the regulation, then according to
constructionjoints processing, in concrete compressive
strengthis not less than 1.2Mpa, allowed to continue
perfusion.
2,on the hardened concrete surface continue to pour concrete,
removethe surface cement film and loose gravel or weak concrete
layer,and fully moist and rinse clean, residual in the concrete
surfacewater to clear.
3,before pouring,
Theconstruction joints should be paved with cement paste
first.
Treatmentmethod: when the surface crack is thinner, the water
canbe cleaned by the water, and the water is fully wetted.
Carefulhandling of the mezzanine. Before strengthening, the
temporarysupport can be used before the reinforcement can be
carriedout. The sundries in the interlayer and the soft
concreteare removed, cleaned with water, fully moistened and
repoured, and compacted with fine stone concrete with a first
strengthgrade and seriously maintained.
Masonryaspect:
Mainlyto see the full degree of mortar joints, surface
smoothnessof verticality, door and window lintel settings, the
heightof the hole size, doors and windows; doors and windows
fixed(pre buried cement brick, fixed spacing), through local
joint(light), masonry tie bar construction hole setting. Local
damagerepair. Joint internal cleanup work, ^^^^^ concrete or
masonrycode, see
Detailand roofing
Separatethe details and the roof, mainly because there are many
problemshere. According to different projects, there are
specificcases
Themain problem: the balcony board awning, pick component,
roofdecoration elements, stairs, etc. the roof waterproof
problem.
Mainexperience Watch
Thesize of beam plate positioning whether the design
requirements,the forming quality how, whether there is
honeycombetc.. There are traces of repair, if any, should be
askedto repair reasons, whether it will affect the accuracy
ofembedded embedded parts structure, reinforcing is reserved,
rainwaterpipe tunnel is set up accurately, toilet and other
equipmentis required to set, the hole on the plate reinforced
afterthe closure is not reserved. Is the mortar in the masonry
projectfull?,
Whetherthe strength is enough (can be pulled by hand), how to
layout the masonry, whether it is straight and whether the wall
issmooth or not. Whether the design of masonry structure column
Cha,frame beam of masonry is dense, is set according to the
requirementsof the ring beam. Is the thickness of the mortar
levelinglayer on the wall too thick?. Take a look at each layer
ofconstruction records of the settlement, whether there is too
muchdifference in settlement. What is the increase in
settlementper floor and the difference between the observation
points?.If the difference is too large, first of all, to
increasethe density of the grand view. Construction record,
allkinds of material qualification certificate, strength test
reportof test piece, etc.
Buildingdeformation should be carefully checked, depending on
thedeformation observation results, but also depends on
whetherthe scene deformation cracks
Thelarger cast-in-place plate must see, generally refers to
thethickness of more than 120 of the formwork, if the branch
istoo high, then the thickness of the plate is difficult to
achieve!
Acceptancestage is divided into: 1. pit test trough; 2. steel
concealedacceptance; 3. main acceptance; 4., final acceptance